Leaks were observed in the body of the Berdu fill dam, which endangered its stability. It was found that the source of the leaks was a 500 mm diameter pipe, abandoned after the completion of the dam construction works.
The effect of the injections with the Geopur material was immediate, the leaks were stopped urgently.
Design Sketch:
Leaks were observed in the body of the Berdu fill dam, which endangered its stability. It was found that the source of the leaks was a 500 mm diameter pipe, abandoned after the completion of the dam construction works.
The effect of the injections with the Geopur material was immediate, the leaks were stopped urgently.